Goiânia, Brazil

Ancillary Infrastructures

  • Sub-Station
  • Transmission line

  • Client: Union Brentech SA
  • Location: Goiânia, Brazil
  • Contract type: EPC
  • Sub-Station: 0.4KV/225KV
  • TL length: 14 KM
  • COD: June 2008
en_USEnglish