Telemenia is a relatively new comer to the hydropower arena. In the last few years the company secured and is developing several  projects, both as EPC and IPP. In hydropower  projects, Telemenia takes advantage of its vast experience in electro-mechanical engineering and construction and joins forces with top-notch civil engineering companies to develop technically advanced, economically sound HPP projects, both for dam type and run-of-river applications, ranging from 20MW to hundreds of megawatts. The cooperation with leading players in this area, such as Andritz, MWH and others, further strengthens the capabilities of Telemenia to offer a full package for the developments of HPP projects. The typical scope of supply includes:

  • Complete feasibility and engineering package
  • Procurement and project management
  • turbines ranging from 1 to 100MW (all types)
  • Synchronous alternators coupled to the relevant turbines
  • Powerhouse including civil works, steel structure, relevant balance of plant equipment (pumps and piping,  lube oil separation/filtration, ventilation and firefighting system)
  • Control room and electrical room according to the latest technologies and regulations
  • Control systems, HMI and communications systems
  • Dams (all types)
  • Penstock, gates and valves
  • Culverts, tunnels and spillways
  • Offices, maintenance bays, roads and infrastructure
  • Substation and relevant electrical equipment
  • T-lines construction
  • Optional long term operation and maintenance (O&M) contracts