Bobo II+III, Ouagadougou, Burkina-Faso, Power Station (IMG_NUMBER1) Bobo II+III, Ouagadougou, Burkina-Faso, Power Station (IMG_NUMBER2) Bobo II+III, Ouagadougou, Burkina-Faso, Power Station (IMG_NUMBER3)

The project is an extension in 2 phases  of the existing Bobo 20 MW power plant. BOBO II project is currently being constructed consisting of 4x12.5MW MAN engines, power house and auxiliary systems. This project will be handed to Sonabel In Q1 2015, bringing the total capacity of  the Bobo plant to 70MW.


The extension was built in a new power house adjacent to the existing plant and  includs the latest control and operation systems. As part of the extension, Telemenia upgrades the existing control system at the Bobo plant and integrated it with the state-of-the-art control system to be installed by Telemenia for the new Plant.

BOBO II Project's movie

Customer:

SONABEL - NATIONAL COMPANY OF ELECTRICITY OF BURKINA

Application: Expansion of the existing Power Plant
Location: Plant Bobo, Burkina Faso
No. and engine type:

Phase 1:2X12V 48/60 MAN

Phase 2: 2X12V 48/60 MAN

Plant output: 50MW
Fuel: HFO/DDO
Contract award:

Phase 1: 5/2013

Phase 2: 10/2013

Construction period:

phase 1: 2013-2014

Phase 2: 2014-2015

TM’s work scope: EPC